Completed in 2025, the Country Club Way Bicycle and Pedestrian Improvements project travels from US60 to north of Warner Road, following ASU Research Park, Country Club Way, Shutterfly Way, and Watson Drive. It includes a 10-ft-wide concrete path, adjacent equestrian path (Warner Road to Elliot Road), landscaping, lighting, a shade structure, and a pedestrian-activated signal at Warner Road. On-street portions included bike lanes, new crosswalks, sidewalk ramps, and pavement resurfacing.
Funding
- Design: $83,000 Congestion Mitigation and Air Quality Improvement grant.
- Construction: $2,611,733 Congestion Mitigation and Air Quality Improvement grant for Warner Road to US 60.
Documents
April2024_RevisedLandscapePathSheetsCombined_ReducedSizeDraft
2.2024 UtilityConflictLocations_Concepts_SurveyResponses
CCW Three Week Look Ahead 2025
6.2021 CCW Public Input
06.2021 Plan View and Rest Node Concepts
06.2021 Elliot to Warner Plan View
06.2021 Western Canal to Elliot Plan View
06.2021 Guadalupe to Western Canal Plan View
06.2021 US60 to Guadalupe Plan View
06.2021 Roadway Path Landscaping
3.2021 Public Input Summary February meetings
2.2021 Illustrated Plan View
2.2021 Rest Node Concepts
2.2021 Guadalupe Watson Alternative
2.2021 Elliot Western Canal Alternative
2.2021 Conceptual Landscape Plan
10.2020 Public Input Summary September meetings
9.2020 Western Canal to Guadalupe Rd Alternatives
9.2020 Warner Rd to Elliot Alternatives
9.2020 Watson to US60 Alternatives
9.2020 Elliot Rd to Western Canal Alternatives
9.2020 Guadalupe Rd to Watson Alternatives
9.2020 WebEx Instructions