Construction of the new dam finished on May 7, 2016. These photos document the construction process.   

Feb 10 

Crews began pumping water out of Tempe Town Lake on Feb. 10 using these four pumps. The pumps move the water from Town Lake into the SRP canal system where it will be used for urban irrigation, such as lawns, parks and other needs. Together the pumps move about 10,000 gallons per minute. Town Lake holds about 800 million gallons of water.  

pumps feb 9

Pipes transporting water from Tempe Town Lake into the canal system. 
pipes

Construction continues on the new dam. Crews are installing hydraulic cylinders the height of about three or four people. PCL construction will install the remaining gate and finish any work that is required between the two dams and prepare to remove the rubber bladder dam by end of February. 

gates feb 9

Dec. 1, 2015

 
PCL Construction Manager Adam Gordon on one of the gates being installed. 

 workers install seal

Workers install a strip that will prevent water leaking into the new dam.  

 WEB Adam and Jason

Tempe 11 was onsite to film a video about dam construction.

Nov. 5, 2015

panorama of first gate web version

Panoramic photo of the first gate taken from center of the Town Lake Pedestrian Bridge. 

 

Oct. 26

IMG_4037Watch a video of the first steel gate going in at Tempe Town Lake: https://youtu.be/fY224sDU41Y 

 

 

 

 

 

 

 

 

IMG_4018

Tempe supervisor Cliff Williams with City of Tempe engineers Chris Kabala and Andy Goh.

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Download Acrobat Reader Download Windows Media Player Download Word Viewer Download Excel Viewer Download PowerPoint Viewer