McClintockUnderpass

Rio Salado Multi-Use Path Underpass at McClintock

Print
Press Enter to show all options, press Tab go to next option

The Rio Salado multi-use path underpass at McClintock Drive will be located on the south bank of the Rio Salado multi-use path system at McClintock Drive.  The west and east sides of McClintock Drive have existing paths, and path users are currently expected to cross McClintock at the street level at the nearest traffic signal. Tempe has built several underpasses along the Rio Salado including at Mill Avenue and at Rural Road on both the north and south side of the Town Lake. The path will meet all necessary design requirements and traverse under six lanes of traffic on McClintock Drive.  The project is identified in the 2020 Transportation Master Plan and will provide a convenient and attractive link in the city’s non-motorized network.  Design of this structure will require a structural and civil engineering team, involve public outreach, and take approximately three years from design to construction.