Operations Division
Operations Division includes Engineering
support, Tempe Town Lake operation,
maintenance and water quality, preparation of the O & M budget, Capital Improvement Project Coordination,
Water Utilities Department Integrated Master Plan, as well as Security.
Plant Operations which includes:
 |
Description of the
plant process
 |
O&M of the
Johnny G. Martinez 50 MGD Water
Treatment Plant (JGMWTP) |
 |
O&M of the South Tempe 50 MGD Water Treatment Plant
(STWTP)
|
|
 |
Description of the
facility process
 |
O&M of the Kyrene
Reclamation facility 9.0 MGD wastewater treatment capacity
|
|
 |
SCADA (Supervisory Control and Data Acquisition) Control Center where
data from the facilities and throughout the distribution system is
relayed and monitored. |
Transmission and Collection
which includes:
 |
Maintenance and rehabilitation of distribution system
(808 miles water lines) |
 |
Maintenance and rehabilitation of wastewater collection
system
(496 miles of sewer lines) |
 |
Maintenance
of Storm drain system(163 miles) |
 |
Flood
Irrigation |
 |
O&M of
Field Sites (Tempe's
groundwater wells,
storage
tanks, wastewater lift stations, storm drain lift stations, and
pump stations) |
 |
Sewer Roach Control |
|