McAllister Avenue between Lemon Street and Apache Boulevard is closed in both directions Dec. 21 to Jan. 4 to allow for the undergrounding of utilities.
FLASH Forward – Regular route south on McAllister Ave. to Lemon St.; east on Lemon St. to Rural Rd.; south on Rural Rd. to Apache Blvd.; west on Apache Blvd to resume regular route at McAllister Ave.
FLASH Back – Regular route east on Apache Blvd. to McAllister Ave.; continue east on Apache Blvd. to Rural Rd.; north on Rural Rd. to Lemon St.; west on Lemon St. to McAllister Ave.; north on McAllister Ave. to resume regular route.
FLASH McAllister will not be in operation due to the winter holiday.