Permit for Hauling

Print

APPLICATION INSTRUCTIONS:

  1. Customer fills out the application, including a map of the route.
  2. Customer submits completed application to Traffic Engineering for review and approval. (Traffic Engineering will review within 48 hours.)  Application can be submitted via fax (480-350-8878); e-mail (trafficbarricade@tempe.gov); by mail at P.O. Box 5002, Tempe, AZ, 85280; or visit the office at 200 E. Fifth Street.
  3. Once approved, Traffic Engineering forwards completed application to Engineering.
  4. Engineering ensures that customer’s Insurance Certificate, Contractor’s License, and Privilege Tax Number are on file and current, email to: Engineering_techserv.gov. (Engineering will review within 24 hours.)
  5. Engineering assigns a Permit #, collects fees (if applicable), Customer has to come sign for the Haul Permit.  ***IF FEES ARE DUE, CUSTOMER MUST COME IN BY 4 PM**** 
  6. For Over-size/Over-weight permits click here.  

DEFINITIONS:

Dates of Hauling Operation: Start date - Finish date.

Number of Days of Operation: Total number of calendar days (start to finish).

On-Site Work Hours: Hours being worked by general contractor.

Times of Haul: Hours of haul operations.
No haul allowed during peak hours (7:00-8:30AM, 4:00-6:00PM).
Night hauling requires Noise Abatement Permit.

Number of Trucks: Example: One every 3 minutes equal 20 trucks (60 min cycle)

Frequency of Truck Circulation: Example: One every 3 minutes.

Type of Truck: Check appropriate box.

Total Cubic Yards of Haul: Self-explanatory.

Street Names/Routes to be used: Attach a map showing export site, import site, and route.
No hauling through construction sites.

NOTES ON CHANGING APPROVED HAUL ROUTE PERMIT; FEES:

New Import Site: Requires NEW Haul Permit Application with updated map showing “original” import site, “new” import site, and route.                            (Note: Same Haul Permit Number; No New Fees.)

New Export Site: Requires NEW Haul Permit Application with updated map showing “original” export site, “new” export site, and route.                            (Note: New Haul Permit Number; New Fees Assessed.)

Fees: Under 5,000 cubic yards and less than 10 calendar days in duration..............No charge

Under 5,000 cubic yards and more than 10 calendar days in duration.....................TBD

5,000 to 10,000 cubic yards................................................................................TBD

Greater than 10,000 cubic yards.........................................................................TBD

SEE PREVIOUS PAGE "Engineering Record Fees" for updated fees for these permits, or contact Engineering_techserv.gov for more questions.